Follow us :

en

SYSTEM Energy

TIGO Energy MM-2ES 50

Published
11/02/2015
Product code
SP15211
Price
EUR 1 990
Applications
Available sample Available flyer Ask for info

The Optimizers Market, as well as the Micro Inverter market, has experienced a significant growth in recent years, and forecasts for future years are promising.

The main function of an optimizer is to improve the energy harvest from photovoltaic panels. Tigo Energy, a world leader in this technology, offers an innovative solution, the Dual Maximizer, using a patented impedance-matching technology. Working with a complementary Management Unit, the Dual Maximizer can be connected to one or two PV modules and is expected to reach a record peak efficiency of 99.5%. An integrated Zigbee Module is used for wireless communication with the Management Unit.

Based on a complete teardown analysis, the reverse costing report of the TIGO MM-2ES 50 Dual Maximizer published by System Plus Consulting provides the bill-of-material of the product and an estimation of the production cost of the maximizer.

Back to top

Overview/Introduction

  • Executive Summary
  • Reverse Costing Methodology
  • Company Profile and Product Range
  • Main Features

Physical Analysis

  • Views and Dimensions of the Maximizer
  • Maximizer Opening
  • Connectors & Cables
  • Electronic Boards
    • Main Board – Top Side – Global View
    • Main Board – Top Side – High Definition Photo
    • Main Board – Top Side – Markings
    • Main Board – Top Side – Components Identification
    • Main Board – Bottom Side – Global View
    • Main Board – Bottom Side – High Definition Photo
    • Main Board – Bottom Side – Markings
    • Main Board – Bottom Side – Components Identification
    • Zigbee Board – Top Side – Global View
    • Zigbee Board – Top Side – High Definition Photo
    • Zigbee Board – Top Side – Components Identification
    • Zigbee Board – Bottom Side – Global View
    • TIGO-COMM-02 Analysis

Cost Analysis

  • Accessing the BOM
  • Estimation of the cost of the PCBs
  • BOM Cost – Main Board
  • BOM Cost – Zigbee Board
  • Estimation of the cost of the Housing Parts
  • BOM Housing
  • Material Cost Breakdown
  • Accessing the Added Value (AV) cost
  • Main Board Manufacturing Flow
  • Details of the Main Board AV Cost
  • Zigbee Board Manufacturing Flow
  • Details of the Zigbee Board AV Cost
  • Details of the Housing Assembly AV Cost
  • Added Value Cost Breakdown
  • Manufacturing Cost Breakdown

Estimated Price Analysis

  • Estimation of the Manufacturing Price
  • Estimation of the Selling Price
  • Functional Cost Breakdown

Contact 

Back to top
© Copyright 2019 SYSTEM PLUS CONSULTING SARL l Tous droits réservés l Legacy Mentions